Vantagem/Nota
- Timesaving due to reduced number of work steps on placing the packers
- The wedge packer is driven directly in the crack, (no time-consuming drilling work needed)
- After the injection the packer can simply be removed
Material de entrada
- micro cement
- cement paste
- cement suspension
Dados técnicos
free passage | Ø 6 mm |
Acessórios
Artigos correspondentes